Thursday 25 April 2013

Lots or work has been done

So alot of work has been done since the last post, we have had most of the plumbing done, most of the painting done, tiling done, shower screens installed and electrical fitout complete. All that is left is the splashback installation, final painting to be done, carpet to home theatre to be laid. Hopefully we can get to final inspection soon. Below is the pictures from the last few days:



























Tuesday 9 April 2013

Tiling almost done, Cabinetry and Benchtops installed

So since last post we have had Kitchen and benchtops installed, skirting and windows installed, doors installed and at lockup. We have now had tiling started and benchtops installed, below are some pictures of the updates.